全站搜索

服务于支持

Greenmax's business service process

Our experience and technical expertise ensure that all our customers can obtain industry-leading support and advice in the process of continuous service and support from order placement to installation and commissioning. We provide a simple, step-by-step but comprehensive process, which is flexible enough to be customized according to the specific needs of customers.

Step 1: Evaluate customers

We provide customers with suggestions on how to apply the plasma system to their processes, as well as the types of plasma equipment suitable for their needs.

Step 2: Raw material analysis

In order to technically evaluate the applicability of plasma treatment raw materials, we provide support in reviewing chemical analysis (provided by the customer) before advancing the plasma project to the next stage

Step 3: Feasibility study

我们能够提供全面的可行性研究报告,以满足客户的个性化要求,从桌面研究到现场调查和物理测试。

桌面研究

We can provide a complete set of research reports, including chemical analysis of raw materials and products, leachate test and various microstructure and material properties test. We can also use the software package to carry out thermodynamic modeling of customers' raw materials. Detailed 3D CAD drawings can also be provided when viewing the existing process and equipment installation in the new plant.

Financial modeling

 我们的技术能够根据当地条件进行扩展和配置,我们与客户合作开发定制的商业模式,详细说明收入,运营支出,资本支出和投资回报,符合客户自己的要求。

试验(工厂运行)。我们能够在我们的等离子试验设施中为客户提供原料的现场测试,这使客户能够亲眼目睹等离子体在行动,以及对过程,排放和残留物的完全可见性。所有试验数据都以详细、全面的技术报告形式提供。

Step 4: Environmental compliance

We understand the importance of complying with regulations during operation and support their understanding of the impact of plasma technology and its surrounding environment.

Step 5: Field visit

During the field visit to the proposed facility, we will check the applicability and infrastructure to ensure that the site is ready for the installation phase.

Step 6: Installation

We have a highly skilled on-site service team, which can supervise the installation of plasma equipment by the customer's installation team to ensure that the installation process is managed as skillfully as possible.

Step 7: Commissioning and training

During the commissioning phase, we ensure that each operating component of the plant is inspected and tested, and that its customers have received the correct training to provide them with the expertise required to operate the new plasma facility.

Step 8: Continuous service and support

We provide customers with comprehensive and continuous remote support, whether ordering spare parts or equipment maintenance support, to solve any needs as quickly and efficiently as possible. We also understand changes in factory demand to ensure continued customer value.

下一篇:

相关推荐

  • Definition of solid waste

    4497

    固体废物是指在生产、生活和其他活动中产生的丧失原有利用价值或者虽未丧失利用价值但被抛弃或者放弃的固态、半固态和置于容器中气态的物品、物质以及法律和行政法规规定纳入固体废物管理的物品、物质。不能排入水体的液态废物和不能排入大气的置于容器中的气态废物...

    查看全文
  • Current solid waste treatment scheme

    4111

    城市固体废弃物的一般处理方法及其优缺点 当前中国城市生活垃圾的主要收集方式:目前世界各国处理城市垃圾粪便所采用的方法有填埋、焚化、堆肥、以及制取沼气等。 垃圾填埋:垃圾填埋分为一般填埋和卫生填埋两种。前者破坏环境, 污染空气与水源, 多已限制使用;...

    查看全文
  • Smelting application

    4819

    1.等离子对冶炼应用的实践 科学家们已经建立了完善的等离子冶炼理论,解决了一系列涉及工业推广应用的实践问题。在金属的纯洁度、夹杂分布、晶体组织结构等方面,等离子技术与电渣重熔、激光和电子束重熔、真空感应熔炼等技术不相上下,在一些领域甚至有独特作用...

    查看全文
  • Progress of national solid waste pollution prevention and control

    4036

    (1)“清废行动 2019” 为贯彻落实习近平总书记重要讲话精神,坚决遏制固体废物非法转移倾倒案件多发态势,确保长江生态环境安全,2019 年生态环境部组织开展打击固体废物环境违法行为专项行动(“清废行动 2019”),通过卫星遥感等方式对长江经济带 11 省(市)126个城...

    查看全文

您好!请登录

点击取消回复
    展开更多