Technical advantages of Greenmax technology electromagnetic plasma artificial intelligence fully automated system

The volume of ash is significantly reduced, and the volume can be reduced by 5 ~ 10 times;

Form granular or powdery stable products, and the ash properties are greatly improved;

The ash product is odorless and pathogen free, which reduces the relevant negative environmental effects and makes the treated ash more acceptable;

The products have many uses, such as fertilizer, soil conditioner, alternative energy, etc.

格灵迈油田废旧垃圾人工智能全自动化处理系统与国际同行设备对比表

Serial numbernameGreenmax equipmentInternational counterpartsremarks
1ManufacturerChina GreenmaxThe United States, Canada, Germany, Russia,
Israel, Japan, etc
Westinghouse Electric, peatinternational, Inc,
France aerospace, europlasma, tetronics, etc
2Nominal daily throughput50 tons50 tons
3Actual daily processing capacity24-50 tons5-10 tons / day
4Plasma generator life10000-20000 hours500-1000 hours
5Plasma gun replacement cycle50-60 months3 months
6Plasma gun replacementReplace atnormal temperatureWait for 3 days for the furnace body to cool and then replace it
7Plasma gun replacement environmentNormal temperature environmentHigher temperature 40-50 ℃The higher the temperature is, the worse
the maintenance environment is, and the staff will stop to have a rest every 30-45 minutes
8energy consumption10KW/H100-200KW/HHandle the same amount per hour (10 tons)
9Energy supplySolar energy can be used (two-phase 220V power supply, 10kw/h)(100-200KW/H) Solar energy cannot be used (three-phase 380V power supply, 100-200kw/h)
10Gas or gas energy supplyStarting requires a small
amount of gas or gas (0.2-0.5m³)
Always supply natural gas or gas (3-5M³)
11Oil content of oil residue after treatment0.0001% (reaching the national first-class standard)equally
1224-hour operationOnly 2 people are neededNeed 7-8 people
13System self generation (waste heat power generation)Support waste heat power generation (steam turbine)Waste heat power generation is not supported
14Environmental impact of treated waste residueClean without impact (no pollution to groundwater, etc.)Clean without impact (no pollution to groundwater, etc.)
15Device mobilitySupport convenient mobility (relocation, mobile leasing)Mobile is not supported
16Floor area of equipment54m³,About 1 40 foot container flat cabinet108-162m³,About 2-3 40 foot container flat cabinets
17operating costsExtremely lowIt is more than 3 times the operation and maintenance cost of Greenmax equipmentLabor cost of operators, land occupation cost, natural gas cost, etc
18Maintenance cost (consumables replacement cost)Extremely low (only about 10% internationally)Extremely highPlasma generator replacement cost and equipment maintenance cost
19Furnace life8-10 years (made of high-grade steel)About 5 years (Russian and American
equipment, made of ordinary steel), the actual service life is about 3 years, and the system will be scrapped
20Front end crushing processSupport front-end feeding and crushing (more sufficient combustion,
shorter time required and higher processing efficiency)
Does not support front-end crushing (large feeding,
longer combustion events, and continuous supply of natural gas or gas)
The front end is crushed, the combustion is more sufficient, and the exhaust emission is more environmental friendly and clean
21Full automation of artificial intelligenceSupport full automation (automatic slag discharge)Automation is not supported (manual removal of slag is required)Low labor efficiency leads to higher operating costs
22artificial intelligenceSupport (to be supplemented later)I won't support itIntelligent big data analysis, cloud platform
remote control, intelligent sensor monitoring
23Use of treated fly ashA. Use it in cement (concrete).
B. Fired into industrial floor tiles

Contact us